MA Structure Engineering in Las Vegas, USA - Mustapha Assi Engineering
 
Home   >   Mustapha Assi  >   Structural Engineering Projects  >   Media & Contact
 
 
 

 
 
 


 

<< Structural Engineering Projects Portfolio >>

High-Rise Condominiums Projects
 
   
Montelago Village at Lake Las Vegas
Montelago Village Resort
Henderson, Nevada

8 story high-rise condominium on top of 2 story parking structure. Structural system is cast-in-place concrete. Part of a multibillion-dollar collaboration at beautiful Lake Las Vegas for Intrawest Resorts Development.
 
 
 
Queensridge Towers Queensridge Towers
Las Vegas, Nevada
Construction Cost: $300 million

4 high-rise condominiums, 18 stories each over 2 levels of subterranean parking, with an attractive podium level and amenity deck that includes fitness center, pool, clubhouse, and other facilities for luxurious living. Structural system is cast-in-place concrete with post-tensioned and mild steel reinforcing.
 
 
 
Soho Lofts
Soho Lofts
Las Vegas, Nevada
Construction Cost: $60 million

An 18-story condominium that captures the essence of loft living in the heart of downtown Las Vegas.

In addition to the 5 levels of parking structure, the roof deck is a combination of a complete fitness center and lap pool. The structure system is cast-in-place construction, post-tensioned and mild steel.

Due to the challenging soil condition of the site, the foundation is a combination of micro pile and mat footing to control settlement and utilize the most economical foundation system.

 
 
 
Villa D'Este at Vegas Grand
Villa D'Este - 12 Story Luxury Condominium


Bella Venezia at Vegas Grand
Bella Venezia - 4 Story Luxury Condominium


Cipriani at Vegas Grand
Cipriani - 6 Story Luxury Condominium

 
Vegas Grand Condominiums
Las Vegas, Nevada
Construction Cost: $200 million

This is a multiple mid and high-rise condominium project. The buildings range from 3 stories to 12 stories. It is a 24/7 guard gated community.

It features an Italian villa look complete with Italian cobblestone street accents, a Mediterranean fountain and amenities deck.

Construction is a combination of cast-in-place concrete, cmu masonry and wood structure. All parking structures are of pre-cast, pre-stressed concrete.

 
 
 
Newport Lofts - Roof View
Newport Lofts - Roof View


Newport Lofts
Newport Lofts
Las Vegas, Nevada
Construction Cost: $60 million

23-story high-rise condominium in the heart of downtown Las Vegas. Structural system

 

 
     

(c) Mustapha Assi
Las Vegas, Nevada, USA